Friday, July 31, 2009

Barr Environmental Explains the Background to the Garlaff Leachate Treatment Plant Project


The following is based upon an article about the latest Enviros designed and commissioned Leachate Treatment Plant, published in the July 2009 Edition of the Community Newsletter published by Barr:

Rain falling on the waste in a landfill is held within the plastic lining the waste sits on, which is intended to stop the rainfall entering the soil and rock beneath.

As site operator Barr Environmental needs to pump it out of the waste and treat it as per their SEPA waste permit. Till last year the leachate from the waste at Garlaff was treated in an open lagoon system close to the site entrance. While this plant still worked it was built many years back and wasn't able to treat the leachate to the highest standards now feasible. This old plant has been substituted by a state of the art treatment system beside Cell two of the rubbish heap.

The new plant is one of the most recent systems in the United Kingdom and was designed by leading leachate professionals Enviros. The consultants have designed over one hundred plants around the globe to treat this kind of waste water and have advised the UK govt and in particular the DEFRA government department in the Best Available Techniques (BAT) available for this kind of leachate treatment.

The plant is entirely automated and computer controlled and can nicely treat all of the leachate the landfill site produces every day. The system was built by Barr Surfacing & Civil Engineering and largely invisible from outside of the site as four fifth's of the plant is built below ground, rather like a below ground multi-storey car park.

The leachate is pumped from the rubbish heap from a series of wells in the waste to an large holding tank in the plant. There were some concerns about odour from this tank. So, all the tanks have been sealed at the top to stop any smells entering the air round the site before the leachate starts to be dealt with.

The main treatment tank is aerated and the leachate treated using the natural microbes in the sludge in the tank in the same way a sewage plant works. These microbes are specifically evolved to treat the ammonium rich liquid to provide a clean liquid that is fit for discharge to the brook.

The plant has been engineered to the most recent standards with a high efficiency energy rating that's achieved by insulating the tank with earth around it and transferring the heat from the aerators into the treatment liquid. Keeping up the leachate temperature through the winter at about 25 degrees C creates the ideal conditions for fast decrease in the pollutants within the aeration tank.

Still working with nature the final part of the treatment process uses natural reedbeds on site to shine and take away the last traces of solids and nitrogen.

The reedbeds have proven to be a helpful habitat as well to wildlife. They will quickly become home to many insects and the tiny birds that eat them.

Barr have been so happy with this new leachate plant that they have just built its twin at their other landfill site, at Auchencarroch in West Dunbartonshire, Scotland. Together these plants are the biggest and most modern leachate plants to ever be built in Scotland and controlled by one company.

The plants will operate for no less than the next 30-40 years till the leachate has been fully treated on the site and no longer is required to be removed.

Tuesday, July 14, 2009

Environment Agency UK Issues Guidance on Environmental Permitting for "Orphan" Leachate Treatment Plants

Earlier this month (July 2009) the EA's Modernising Waste Regulation Panel issued a Regulatory Position Statement about Environmental Permits for Waste Treatment Plants.

This has updated a previous pair of statements on this subject which we found hard to interpret, and which were issued a least a year ago.

Under the original EU Directive based PPC Regs. and UK permitting rules it appeared that in due course all leachate treatment plants greater than 50 tonnes per day (50 cubic metres per day) capacity would have to be officially issued with a permit by the Agency. This would be the case even if the plant had been in existence for many years and was clearly complying with its watercourse (or sewer) discharge consent and not causing any environmental problems at all.

From the start this seemed absurd, and an enormous cost and bureaucratic burden on the operators of these plants, without anyone really being clear what benefit would result.

As time progressed and the Environment Agency concentrated on prioritising the most important treatment processes and all new landfills, we all wondered when they would catch up with this and start contacting the operators of these so called "orphan" sites.

Now, finally it seems that most if not all leachate treatment plant owners and operators that do not already have an Environmental Permit, or have been required to submit for one, for their leachate treatment plant can relax about this.

The position statement says:

The Environment Agency’s position:

We will not pursue an environmental permit application for an IPPC directive waste treatment activity where all the following conditions are met:

• the treatment plant is subject to a consent issued under the Water Industry Act or the Water Resources Act;

• the plant only treats waste/waste water produced on-site and does not import it from other sites;

• management of the activity ensures that the risk of pollution incidents from the site, including nuisance, remains low;

• relevant operational records are kept for a period of four years and made available to Environment Agency officers when requested.


However, if you do own or operate a leachate treatment plant on what would usually be a closed landfill, you should not rely on this posting alone, and you really should visit the EA's web site and read it for yourself at the WTP Orphan page/pdf.

However, here is a thought to end this post. How many closed landfill leachate treatment plant operators have a full 4 years of data properly archived and ready for inspection, if requested. I wonder!?

Thursday, February 12, 2009

WRG Arpley Landfill Passes 1/2 Million Tonnes of Leachate Treated


From the WRG Newsletter

During early 2008, WRG’s Arpley leachate treatment plant passed a total of 500,000m3 of leachate treated. Since it was commissioned in October 2001, the plant has been treating very strong leachates which routinely contain greater than 2000mg/l of ammoniacal-N, to standards which allow safe discharge of effluent into the River Mersey.

When WRG took over Arpley Landfill in the spring of 1999, leachate was not under control. Although heads of leachate on the liner were limited to a maximum depth of 1 metre, levels were typically 7 or 8 metres, and well out of compliance. A key part of site remediation was investment of more than £1 million in a dedicated pneumatic leachate collection system, to automatically manage leachate levels in nearly 100 boreholes. From the start of 2001 leachates then began to be tankered off-site for treatment, at rates of up to 10,000m3 per month.

This allowed detailed pilot-scale treatability trials to be carried out by Enviros, to enable an optimum treatment scheme to be developed, which would represent the largest load of contaminants to be treated at any landfill site in the UK. WRG were no stranger to leachate treatment. In 1994, working with Enviros, a large leachate treatment plant had previously been designed and commissioned at Buckden Landfill near to Huntingdon, where a discharge consent into the sensitive River Great Ouse demands that rainbow trout shall be unharmed after 96 hours exposure to the final effluent. That plant continues to perform well, nearly 15 years later.

The treatment process adopted at Arpley (Plate 1) includes aerobic biological treatment of up to 450m3 of leachate each day, in three identical large Sequencing Batch Reactors. The SBR process has been pioneered for leachate treatment by Enviros, and shown to provide very stable and robust treatment of the very high ammonia and COD values which characterise leachates from large landfills. Effluent from the SBRs then passes through a Dissolved Air Flotation (DAF) process, which removes any remaining suspended solids. The treated leachate receives final “polishing” by passage through the root zone of extensive engineered reed beds, before being discharged safely into the River Mersey which flows beside the site.

WRG and Enviros worked closely with the Environment Agency to plan and implement the leachate treatment solution, and by 2004 leachate levels had been brought back into compliance with the site licence in every monitoring borehole. The plant remains a key part of controlled landfilling at Arpley, and continues to treat leachates at typical rates of 8,000 to 9,000 cubic metres per month.

Operation of all functions of the plant is completely automated. A programmable logic controller (PLC) provides maximum reliability, and the plant operator interfaces with this using a PC. Many dozens of failsafe systems, alarms, and telemetry links provide enormous security of operation. Experiences at Arpley have also formed the basis for many other large leachate treatment plants around the world. For example, Taman Beringin is a very large landfill located close to the centre of the city of Kuala Lumpur, in Malaysia. Remediation of the site has included a new leachate treatment plant (see Plate 2). It achieves very high effluent quality standards, which allow discharge of treated leachate to be made into a nearby watercourse.

As environmental standards at landfill sites are raised around the world, the ability to treat leachates reliably, and to high standards, remains critical, and WRG and Enviros are presently designing several new plants that will be commissioned during 2009.

Enviros is a UK-based full-service environmental consultancy, with an international reputation in wastes management. In the specialised field of landfill leachate management, the company has unique expertise, having worked on every continent except Antarctica, and has designed and commissioned more than 80 full-scale
leachate treatment plants throughout the World.

Monday, February 02, 2009

Can Landfill Leachate be Treated by Anaerobic Digestion?

Every now and again the question of whether landfill leachate can be effectively treated by Anaerobic Digestion is raised.

My reply is yes, and in fact, it has already happened in the landfill before you usually see most leachate. After an initial aerobic (acetogenic) stage, modern landfills in effect become anaerobic digesters themselves. Once this has occurred the leachate produced has already been subjected to a form of anaerobic digestion, so there is little additional treatment which an AD Plant can provide to these mature leachates once leachate is removed from the landfill.

In a modern Municipal Solid Waste (MSW) landfill. as it is filled, each cell or area within it, will within 6 months to one year, or, at the most eighteen months, not only become airless, but methanogenic (methane producing). Once this happens, the decomposition process taking place in the landfill is broadly similar to, but slower than, that which occurs in an anaerobic digester.

So, modern lined and well regulated landfills these days do, almost without exception, produce a mature methanogenic leachate.

As a result the use of Anaerobic Digestion to treat landfill leachate is not normally a good choice and the use of the Anaerobic Digestion process to treat landfill leachate is not very effective. This can be readily deduced just by thinking about the processes which leachate undergoes within a landfill. The big problem with using AD on a mature leachate would be the lack of significant reduction of ammoniacal nitrogen in the discharge, and ammoniacal nitrogen is one of the most important contaminants to remove, for reduced toxity to water life.

However, the opposite does work. Now think of using aerobic reactors to treat Anaerobic Digestion concentrates, if these concentrates cannot for any reason be disposed as a fertiliser product and thus have to be treated as a waste material.

So, leachate treatment plant aerobic biological reactors can be used very effectively to treat AD liquid digestate, if that "product" ends up proving to be unsaleable locally. Indeed, on site aerobic digestate treatment might be essential in these circumstances if no sewage treatment works was available to accept tanker loads of liquid from an AD Plant.

Sunday, November 02, 2008

Enviros Queried - Can You Treat Our Leachate?

In the past few weeks we have recieved a series of enquiries from landfill operators and water treatment plant contractors/operators, and they have raised a common question, which made us think it worth discussing here.

That recurring question is:

Can You Treat Our Leachate?


and, this is followed by, a comment suggesting that even if we design a plant it might not work.

These enquirers say things like:

We cannot afford to appoint you and for your plant not to work.


After further discussion we have been finding that they have been promised a working leachate treatment plant by an otherwise apparently competent water treatment engineer/ contactor/ operator, and it simply has not worked. By "not worked" this usually means that in some important water quality parameter the plant has failed to treat the substance sufficiently to meet the regulatory requirement.

This is truly a strange concept to us, that anyone offering to design a water treatment process, or any other process for that matter, spends the Client's money and builds a plant, and then is unable to get the plant to work and walks away.

In any other industry the perpetrators of such a debacle would surely have been "run out of town" by now! Or else the lawyers would be involved.

We would just like to say to our readers the following:-

We have only experienced less than half a dozen landfills around the world in the last 20 years which were not treatable by biological methods.

When we find a landfill leachate which we think is unusual and may be hard to treat, we will always carry out a simple treatability trial pilot study to test for the viability of biological treatment using a represetative sample of that leachate, before we commit to treatment.

If in the rare event we were unable to assure ourselves and all involved that we would be able to treat, we would not go forward into the construction stage. (However, we do have about 80 leachate plants to our designs working currently numbering the largest and most difficult anywhere.)

When the waste (which I am assuming will be a primarily Municipal Solid Waste) contains heavy metals high salinity etc, the biomass may take longer to acclimatise, but almost always will become established.

I will mention salinity again, because it brings us to another feature of these enquiries, and that is that many of these sites have RO Plants installed.

If the salt content would be above the maximum watercourse discharge concentration after biological treatment, we would consider installing an RO Plant, but only after biological treatment for any permanent installation.

Reverse Osmosis seldom makes sense as a main "treatment method" for landfill leachates, because biological treatment is normally cheaper than RO and importantly it does actually treat the waste.

Reverse Osmosis does not "treat" anything in the sense of coverting a contaminant from a toxic or damaging form to another chemical form, which is less so or even completely harmless, in the way biological treatment does.

We have been solving these problems for clients for the past 20 years or so, and our successful track record speaks for us.

So, if you are considering approaching the Enviros leachate team to ask us to assist with your project, please be assured that we are not in the business of providing plants that do not work!

Wednesday, June 18, 2008

Last Chance to Book for Leachate Monitoring Course

The next Chartered Institution of Waste Management (UK) Leachate Monitoring course is on 25 Jun 2008, so if you act today there is just about time to register.

This is a One day (non-residential) course held in Shrewsbury, Shropshire, UK.

If you are you involved in the monitoring or the control of leachate from landfills this will be useful to you.

Do you really understand what leachate is and how to effectively monitor it?

This course will provide an understanding of what leachate is, its composition, and appropriate monitoring requirements you should implement.

The course includes practical demonstrations of using a range of leachate sampling and testing equipment.

The course will also provide an introduction to the treatment of leachate.

What’s in it for me?

By the end of the course you will be able to:

• Explain the basic principles of leachate generation
• Identify key contaminants and their risks
• Explain the requirements of monitoring programmes and their objectives
• Identify the range of monitoring equipment used during leachate monitoring and understand how they are used
• Know what current technical guidance documents are available
• Know how to interpret the data generated in order to identify problems and ensure appropriate actions can be determined and taken
• Explain some typical leachate treatment systems and be aware of the monitoring requirements of them.

Who is it for?

Technical staff working in landfill site operations, or design and regulation, with day to day responsibility for the monitoring of leachate generated by landfills or the monitoring of leachate treatment facilities.

Your Leachate News Blogmaster Steve Last will be tutor for the sessions on, "What is Leachate?" and "Leachate Treatment".

For more information, and booking, visit the CIWM web site Leachate Monitoring Course page.

Monday, June 09, 2008

Enviros Commissions 3rd Leachate Treatment Plant in South Africa


Enviros Consulting landfill leachate treatment experts have successfully completed the commissioning of the new Leachate Treatment Plant for eThekwini Municipality's solid waste Disposal department (Durban Solid Waste - DSW).

The plant is treating leachate collected from the Buffelsdraai Landfill, which is a large new landfill located to the north west of the city. The site opened in May 2006 and receives the waste-stream that was originally accepted by the now closed La Mercy landfill site. The site will also accept waste previously disposed at other DSW landfills, including the large Bisasar Road Landfill.

The leachate treatment plant is planned to be completed in two stages with a treatment capacity of approximately 200 cubic metres per day, of which half has now been installed and commissioned.

The plant is the third biological treatment plant using a nitrification process similar to the many other Enviros plants, which Enviros has designed and commissioned in South Africa. It follows the commissioning of the Vissershok Leachate Treatment Plant (Cape Town City Council) and the Mariannhill Leachate Teatment Plant (Durban Solid Waste).

The leachate treatment plant protects the local river from contamination by leachate, which would if not treated, pollute the watercourse. Even if present at extremely low levels untreated leachate can cause taste problems in water later abstracted and treated for potable (drinking) water supplies.

The plant includes a reed bed for final water quality polishing, and will provide water for irrigation and for dust suppression.

Friday, March 14, 2008

New UK Environment Agency Statement on Leachate Irrigation

There has been a gap in the information provided by the UK environment Agency since last year when the BAT Guidance for leachate treatment was publised on the web site www.environment-agency.gov.uk .

The whole area of leachate treatment by irrigation, which is still practised in the UK at a few landfill sites, and which is used to a much greater extent in Europe generally, was until now without any guidance.

To a certain extent that gap has been closed by the position statement published in February, which can be read here.

The regulatory position statement covers the application of treated landfill leachate to short rotation coppice (SRC), but the principles described would presumably also apply to other forms of irrigation (eg grass plot).

In other EU countries, including Scandinavia (which is normally seen as exemplary in their application of environmental controls), the rules are much more relaxed as follows:-

- They allow untreated leachate to be irrigated to short rotation coppice (SRC)

- They allow irrigation not only during soil-moisture deficit periods, but also in many cases when there is not a soil-moisture deficit, so in Europe such schemes entail run-off during irrigation from the irrigated area during wet weather.

- They do not require the base of the irrigated area of treated landfill leachate to short rotation coppice (SRC) to be engineered and to have a barrier to prevent any loss to groundwater, as this is prohibitively expensive for such an otherwise inherently low cost process.

The question has to be asked that if the UK Environment Agency (EA) consider that the EU regulations such as the EU Groundwater Directive, and the EU Landfill and Waste Management Directives require them to take this position, why are not the other EU states applying equal stringency?

Finally, the position statement makes no reference to the dilute leachate which emerges from many old landfill sites in large volumes, where often a lack of original engineering design allows the leachate to become extensively diluted by groundwater.

These old leachates are often very dilute in nature, yet still environmentally damaging, and the techniques which would be applicable under BAT to these would hardly be those which would be applicable for a strong leachate from a WM Licensed or Permitted site. Yet there is still no UK EA guidance on BAT for these examples of leachate.

In my view the effect of this interpretation of the EU regulations will be that the potential opportunity for the nutrients from leachate, which could otherwise be used to water and fertilise extensive use of willow coppicing, much of which in turn could be used for biomass energy production, will be lost.

If it can be done elsewhere, as it is being done, with proper scientific monitoring and control, it should be possible to do this within the UK.

We would be pleased to receive your views - comment on the leachate blog or email me steve.last[at]virgin.net with your views, which if suitable and with your permission, we would like to publish. See also www.leachate-irrigation.com .

Friday, February 15, 2008

Leachate Monitoring (plus treatment) Course

One Day Course 27 Feb 2008

Course Title: Leachate Monitoring (plus treatment)

A one day (non-residential)course

Location: Shrewsbury, Shropshire, UK

Are you involved in the monitoring or the control of leachate from landfills? Do you really understand what leachate is and how to effectively monitor it?

This course will provide an understanding of what leachate is, its composition, appropriate monitoring requirements including practical demonstrations of using a range of equipment. The course will also provide an introduction to the treatment of leachate.

What’s in it for me?

By the end of the course you will be able to:

• Explain the basic principles of leachate generation
• Identify key contaminants and their risks
• Explain the requirements of monitoring programmes and their objectives
• Know what current technical guidance documents are available
• Use the data generated to identify problems to ensure appropriate actions can be determined
• Identify a range of monitoring equipment and understand how they are to be used
• Explain some typical leachate treatment systems and be aware of the monitoring requirements of them.

Who is it for?

Technical staff working in landfill site operations, or design and regulation, with day to day responsibility for the monitoring of leachate generated by landfills or the monitoring of leachate treatment facilities.

For more information and booking visit the CIWM web site here.

Sunday, February 10, 2008

Waste Management Inc. Virginia USA - Leachate Spill Settlement

State's largest landfill fined for garbage juice spill

Originally Posted to: Environment News Virginia

By Scott Harper, The Virginian-Pilot, © February 12, 2008

The owner of the state's largest landfill, in Sussex County, has agreed to pay a $14,250 fine for an environmental accident in 2006, when some 8,000 gallons of garbage juice - known as leachate - spilled into wetlands.

It is the first time that the Atlantic Waste Disposal Inc. landfill, owned by trash-giant Waste Management Inc., has been in trouble with the state Department of Environmental Quality, according to records and officials.

Under the terms of a proposed settlement, the company would pay the fine, assess any environmental harm from the spill and adopt better monitoring of ammonia and other pollutants that might wash off its massive landfill and taint neighboring lands and waters.

Spread across more than 1,300 acres near Waverly, on the western outskirts of Hampton Roads, the private facility accepts the most trash of any landfill in Virginia, said Bill Hayden, a state environmental department spokesman.

Under its state permit, the Atlantic Waste Disposal site can take out-of-state garbage, in-state trash, sludge, scrap metal and industrial debris - but not medical waste, asbestos or hazar dous waste.

It is one of several landfills constructed in the 1990s east of Interstate 95 that have made Virginia the second-largest importer of household garbage in the country. Pennsylvania is No. 1.
According to the proposed written settlement, the accident occurred Nov. 9, 2006. The leachate was being pumped into a tanker truck, but the driver fell asleep and some 8,000 gallons overflowed onto the ground, said Michael P. Kearns, district manager for Atlantic Waste Disposal Inc.

"He woke up and there was stuff running all over the place," Kearns said. "He came and told us right away."

The juice ran off a loading pad, into a drainage ditch and settled in nearby wetlands, which are considered "waters of the state" because of their environmental importance, according to the settlement.

The company immediately contacted state environmental officials, as required by law, and a cleanup began, said Jennifer Hoeffner, a state enforcement specialist overseeing the case. More....

Wednesday, December 12, 2007

Leachate Treatment Issues and Site Closure at a US Site

Landfill wants leachate treatment services, township wants land
By Rodney L. Sherman, Clarion News Editor

FARMINGTON TWP. – County Environmental of Clarion, operators of the landfill in Farmington Township , is seeking a favor from the township and supervisor Ed Heasley wants to close the door on any future expansion of the facility.

It’s possible both goals could be met with one agreement.

County Environmental , also know as County Landfill Inc., is beginning its efforts to close the landfill next year. Company representatives attended the Nov. 7 meeting of the Farmington Township Board of Supervisors to outline their plans for the closing.

One of the ongoing problems at the landfill involves treatment of the leachate produced by the landfill. County Environmental has been unable to resolve problems at its treatment plant and recently was fined $225,149 for exceeding pollution limits established by the landfill’s federal wastewater discharge permit. More here ....

Thursday, July 26, 2007

Kuala Lumpur Newspaper Applauds Enviros Designed Landfill Restoration & LTP

The following article refers to an Enviros concept designed landfill restoration for the local contractor, and an Enviros designed leachate treatment plant.

KUALA LUMPUR: A landfill which once marred Kepong has now turned into an unlikely success story.

A RM24 million campaign by City Hall has turned the rubbish hill into a picturesque mound covered with grass. While it was once shunned because of its terrible stench, it now attracts visitors.

On weekends, the Taman Metropolitan Kepong, a 120ha park located next to the former landfill, is packed with people.

Little do newcomers using the jogging track, extreme water sports facilities and a football pitch know of the malodorous history of the area.

For most, the hillock is a natural part of the terrain.

The excellent makeover was not just skin-deep. Under the pile of rubbish lie 1.8km of pipes that ring its perimeter and channel leachate into two containment pools.

This is then channelled to a treatment plant which in turn converts the leachate into clear, river-safe, water.

The build-up of methane gas from the landfill is also controlled by a series of pipes which allow gas to be released harmlessly.

The dumpsite in Taman Beringin is Malaysia’s first fully engineered landfill closure and rehabilitation project.

Rent and property value in the area have increased dramatically after the demise of the dump.

Residents in Taman Nyanyang, Taman Beringin and Taman Aman have been breathing a sigh of relief after enduring the horrible stench for most of their lives.

More here..

Friday, July 06, 2007

Leachate Safari Visitors Avoid Showers to See Seven Leachate Plants in 2 Days

Everyone kept dry for the Enviros Leachate Safari, which visited 7 plants, and clocked up 700 miles of driving.

Leachate Treatment Plants operated by Viridor Waste Management, Waste Recycling Group (WRG), and the Greater Manchester Waste Disposal Authority were viewed, by the 34 waste management, regulatory officer, consultant, and student, attendees.

The trip provided an informal and enjoyable opportunity for the dissemination of information on the subject.

The celebratory (25 years of Leachate Treatment for Enviros) dinner, which was held at the historic oak panelled "Draper's Hall" in the centre of Shrewsbury, proved popular - where the wine cellar proved to contain some remarkably fine wines.

The trip confirmed that biological leachate treatment is being used very effectively and reliably at a large number of landfills in the UK.

The stars of the tour were definately the daily operators of each plant. They were clearly pleased to show off their plants, with pride, and enthusiasm.

Thursday, June 21, 2007

Last Chance to Book Your Seat on the Enviros Leachate Safari

The Enviros Leachate Safari takes place on Wednesday and Thursday of next week (27th and 28th June).


If any of you planned to join us, but have not yet booked there were just a few seats left this afternoon! Hurry, and you may still be lucky!!


The final itinerary is now also available at the Safari Web Site/Blog at:-


www.leachatesafari.com


This is a rare opportunity to see 6 operating Envrios designed biological leachate treatment plants, and one methane stripping plant, and in most cases their operators will be present to show us around.


You will also see a leachate treatability trial in operation.


This opportunity is unlikely to be repeated for a few years. It was more than 5 years ago that Enviros held the last Safari.


There will be plenty of opportunities to exchange notes on the subject of leachate treatment on the coach as well with leachate treatment plant designers, operators, technicians, council waste officers, students, and even some UK Environment Agency staff present.


International safari attendees are also flying in from Sweden, Ireland and Spain for the tour.


The cost is just £225 plus VAT for two days, including a dinner on the first night.


Visit www.leachatesafari.com for more information. Download the Safari Leaflet for more information, and both Subscribe and Register your details online. (Advance payment is required.)

Thursday, May 17, 2007

Leachate Safari - Places Filling Rapidly, So Book Now!

The Enviros Leachate Safari tour of operating UK leachate treatment plants, which we publicised in this blog in April, has reached the half full stage.

Scroll down in the blog and read about it now if you missed it!

More information, our leaflet and registration details, are available on our blog at http://www.leachatesafari.com , alternatively email Christy Robinson at: Christy.Robinson@enviros.com .

We are delighted to receive so many bookings this early, for the 27 and 28 June event. Unfortunately, we will only be able to take one coach full to these sites, so it is very much first come first served.

We have bookings from leachate plant operators and managers, present, and future for whom we are building new plants, and we also have Environment Agency regulatory staff joining us. There is likely to be at least one research student joining us as well.

So far, our visitors will be arriving from England, Ireland, and Sweden.

If you have been considering joining us don't delay! Act Now! Book now, before it is too late!

Tuesday, April 24, 2007

You are Invited to Our Leachate Treatment Plant Safari (2-Day Tour) - June 27 & 28

It has been a while since we posted to our blog and sent our email Newsletter to you.

That is because we have been very busy organising a Leachate 'Safari', among other things.

Come along with us and join us on our coach tour around the English Midlands, and the North of England, to bag 7 or 8 "big game"(?) leachate plants on 27 and 28 June (plants visited are subject to final itinerary).

OK, so you are right! The closest to a game reserve that we will get to will likely be a "Reserved for the Site Manager" sign in a landfill site car park. Sorry, but we did not think you would be able to afford the cost, or the time of a trip, to see our plants in South Africa. Also, we wanted to make it at least SOUND more interesting to get your attention! (Tell us if we are wrong!)

In all honesty though, this is a rare and very valuable opportunity, which I think you will appreciate now that we have grabbed your attention.

What we can promise you during this conducted and very full 2 day tour, is the opportunity to see a range of Enviros designed leachate treatment plants, and a range of treatment technologies. You will see them operating, and we would expect the plant operators to join us to tell us about their plants during each visit, just as they have on past safaris (although we cannot guarantee this).

There will also be a number of Enviros leachate treatment experts on the tour and present to ask questions throughout. (These are likely to include Howard Robinson, Steve Last, Martin Carville, and Gwyn Harris.)

All the time, while on the coach there will also be many other leachate and landfill management professionals prsent, making this an unrivalled opportunity for newcomers to talk "leachate management". You will very quickly assimilate a lot of information about leachate, and how to manage it, in real-life situations.

(If you need to remind yourself about the types of biological SBR and related processes we provide just visit www.leachate.co.uk.)

During this trip we will also be celebrating 25 years of leachate treatment consultancy, designing, procuring and tendering, supervising construction, and most importantly TRAINING the future plant operators, while we process commission the plants with them.

Yes, we give all the biological process operating sklls we possess to the staff on site, all the tricks we know to keep the bugs (biomass sludge) treating and producing a superb effluent quality, and commissioning is done all the time with the site staff. At times this seems crazy. Where is the business sense for Enviros in that? After all, once trained we are no longer needed, and not many other treatment plant experts would do this.

Nevertheless, this has been good business for us, and the value of this to our clients is undeniable, and there are always new sites and new clients to design for.

As there is good reason to celebrate, there will be a dinner provided on the first evening in a historic Shrewsbury Hotel, in Shropshire. All meals and transport are provided, and accommodation is booked for you.

Full details are available on our web site at www.leachatesafari.com so please visit that site and register, either on-line or download, print, and send, the completed form on the .pdf copy of our leachate brochure which is available online. There is a small charge to cover our costs, and payment must be made in advance.

Oh! and please do also SUBSCRIBE giving us your email address on that Blog site (www.leachatesafari.com) for our Safari Newsletter so that we can keep you updated, even if you are unsure about attending just now, and just wish to think about this opportunity you should still subscribe for more news at www.leachatesafari.com .

We do hope you will attend this tour. We are looking forward to your company on this trip.

DO BOOK EARLY, though as there are no more than 45 places, and there can only be one coach full only. Miss this now, and it might be another 5 years before there is another!

From your web master - Steve Last (Enviros Consulting)

Friday, March 23, 2007

UK EA Says Groundwater at Risk - New Report

VALUABLE GROUNDWATER supplies in England and Wales are at risk because of pollution and increasing demand for water, the Environment Agency has warned.
In a report concerning the state of the groundwater, environment protection director

Tricia Henton said: "Ground-water is very vulnerable to pollution and, while it takes just a few careless moments to pollute or contaminate, it can take decades or even centuries to recover."

That's why we need to do what we can to stop it from being polluted in the first place.


Problems with groundwater quality cost the UK water industry £754M between 1975 and 2004. Poor water quality has led to the closure of 146 groundwater sources over the past 30 years, leading to the loss of at least 425,000m3 of water a day - enough to supply nearly three million people.

The report, Underground, Under Threat - the State of Groundwater in England and Wales, is available at www.environment-agency.gov.uk.

WebMaster: We ahev posted this as leachate can, of course, pollute groundwater badly.

Monday, February 19, 2007

Enviros Joins Alfred McAlpine plc

Enviros was acquired by Alfred McAlpine plc on 1 February 2007.

Alfred McAlpine is one of the fastest growing support services organisations in the UK. They develop, finance, design, build, manage and maintain the buildings and infrastructure that enable individuals and organisations across the UK and Ireland to go about their business. Enviros will be joining Alfred McAlpine Business Services, Alfred McAlpine’s fastest growing business stream which provides facilities management and associated services to many of the country’s leading organisations.

Since the acquisition of its Health and Safety business in 2003, Alfred McAlpine Business Services has had a strategic objective to expand its consultancy offering into the environmental sector and Enviros was its first choice because of its reputation and people.

Alfred McAlpine Business Services recognises that Enviros has a strong name within the market and it will continue to trade as a separate brand with the same management team.

If you would like to know more about Alfred McAlpine please go to www.alfredmcalpineplc.com for Alfred McAlpine's press release on the acquisition go to http://www.alfredmcalpineplc.com/press/releases/

The Leachate Team will continue to provide the leachate mananagement service with business as usual.

For further information contact Nigel Clark, Marketing Director, Enviros Consulting

Friday, January 26, 2007

Canadian Leachate Is Good Enough to Drink - Picture Proves It!

Evidence that some Canadian treated leachate is good enough to drink is given a dramatic demonstration in this picture courtesy of the London Free Press!

Susan Bradnam The London Free Press -- Bob McCaig drinks a glass of treated water from his Green Lane landfill site southwest of London to prove it's environmentally safe. The provincial government has approved a 10-million-tonne expansion of the landfill, raising area fears Toronto will truck its trash there.

http://lfpress.ca/gallery/1560/photos/LDN20060629SB_GreenL34ane.jpg

Wednesday, January 17, 2007

EA Says - Environment Not to be Considered as a Recipient of Pollutants and Waste

The UK Environment Agency's implementation of IPPC Regulations is progressing and the draft Guidance for the Treatment of Landfill Leachate Final DRAFT - Sector Guidance Note IPPC S5.03 is available on their web site here.

This is now (at 187 pages) an even longer document than the orginal draft, but it is now a significant reference document and source of information for all those interested in leachate treatment in the UK, and being freely available for downloading is also likely to be used in many other nations.

The EA does state that:

The BAT approach requires us not to consider the environment as a recipient of pollutants and waste, which can be filled up to a given level, but to do all that is practicable to minimise emissions from industrial activities and their impact.

For those unfamilar with the concept of BAT, BAT stands for Best Available Techniques. What constitutes a best available technique for the treatment of leachate is fully explained in the guidance document. The use of the word technique is broader than would be indicated if the word process had been used instead of technique, and means that a combination of a proven process and optimum implementation of the process is important when establishing that a treatment process is BAT.

Why is BAT important? It is important because the BAT philosophy is central to the UK's implementation of IPPC.

Who does the Guidance apply to? Everyone with leachate to discharge, or tanker away, from an IPPC regulated landfill.

Here is the context for the quotation above, which we have copied from the guidance:-

BAT and Environmental Quality Standards (EQS )

The BAT approach complements, but differs fundamentally from, regulatory approaches based on Environmental Quality Standards (EQS).

Essentially, BAT requires measures to be taken to prevent emissions - and measures that simply reduce emissions are acceptable only where prevention is not practicable. Thus, if it is economically and technically viable to reduce emissions further, or prevent them altogether, then this should be done irrespective of whether or not EQSs are already being met.

The BAT approach requires us not to consider the environment as a recipient of pollutants and waste, which can be filled up to a given level, but to do all that is practicable to minimise emissions from industrial activities and their impact.

The BAT approach first considers what emission prevention can reasonably be achieved (covered by Sections 2 and 3 of this Guidance) and then checks to ensure that the local environmental conditions are secure (see Section 4 of this Guidance and also Guidance Note IPPC Environmental Assessments for BAT).

The BAT approach is therefore the more precautionary one because the release level achieved may be better than that simply required to meet an EQS.

Conversely, if the application of indicative BAT might lead to a situation in which an EQS is still threatened, a more effective technique is required to be BAT for that installation. The Regulations allow for expenditure beyond indicative BAT where necessary, and, ultimately, an installation will only be permitted to operate if it does not cause significant pollution.

Several new leachate treatment technologies have now been included in the guidance. We will post again soon with further information on the technologies within this guidance.